Reel lay vessel

Reel lay vessel

Nov 07, 2019 · The reel lay vessel is the ninth vessel IHC will deliver to Subsea 7. The delivery represents a fully integrated pipelay vessel equipped with a pipelay system designed, engineered and built by IHC

UK-based subsea engineering, construction, and services company Subsea 7 is ready for a launch and official naming ceremony for its newbuild reel-lay vessel Seven Vega. Subsea 7 announced through its social media channels on Friday that the Seven Vega will be launched and officially named on Saturday, May 25. “When delivered, Seven Vega will be […] On Saturday 25 May 2019, Subsea 7 and Royal IHC successfully launched the fully integrated reel-lay vessel SEVEN VEGA.The ceremony took place at IHC’s shipyard in Krimpen aan den IJssel, The Netherlands, and was performed by Monica Th. Bjørkmann, Vice President for Subsea 7 in Norway. In the Reel-Lay method, the pipeline is installed from a huge reel mounted on an offshore vessel. Pipelines are assembled at an onshore spool-base facility and spooled onto a reel which is mounted on the deck of a pipelay barge. Horizontal reels lay pipe with an S-Lay configuration. Vertical reels most commonly do J-Lay, but can also S-Lay. Technip Reel Lay Fleet Vessel Apache II Deep Blue Deep Energy Pipe Diameter 4” to 16” 4” to 18” 4” to 20”* PIP C bilitPIP Capability 10”/16” 12”/17” 12”/18” Payload 2,000te 5,600te 5,600te Top TensionTop Tension 197 te 550 te 450 te Main Reel Diameter 16.5m 19.5m 21m Piggyback System Yes No Yes Craneage 100te 400te 150te Seven Vega is a new reel-lay vessel being built by Royal IHC at its Krimpen aan den IJssel shipyard in Netherlands for Subsea 7. Capable of installing complex rigid flowlines in water depths up to 3,000m, the new vessel will replace Subsea’s Seven Navica, which will be retired from reel-lay operations.

Oct 02, 2017 · Royal IHC and Subsea 7 have signed a contract for the design and build of a high specification reel lay vessel capable of installing complex rigid flowlines including pipe-in-pipe systems. Subsea 7 and Royal IHC launched the fully integrated reel-lay vessel Seven Vega on Saturday, May 25, 2019. Seven Vega; Source: Royal IHC. Following an announcement made by Subsea 7 last Friday that the Seven Vega vessel was ready for a launch and naming ceremony, Royal IHC said on Sunday that the ceremony took place at its shipyard in Krimpen aan den IJssel, The Netherlands, and was performed ... PIPELAYING METHODS S-lay method. Conventional method for rigid pipe. When using the S-lay installation method, onboard welded pipe joints leave the vessel horizontally and are guided to the seabed over a “stinger” - a structure on the back of the ship that supports the seagoing pipe string to control its bend radius.

Feb 06, 2018 · KINDERDIJK, The Netherlands -- Royal IHC has successfully passed the first significant milestones in the design and build process of an integrated reel lay vessel for Subsea 7. The S-Lay method is used for pipelines with diameters from 10 to 30'' in water up to 5000 m. For this type of installation requires an S-Lay vessel, which is basically a floating welding factory, where pieces of 12 m long pipes joint to form the pipeline and lowered to the seabed (Fig. 1). In the Reel-Lay method, the pipeline is installed from a huge reel mounted on an offshore vessel. Pipelines are assembled at an onshore spool-base facility and spooled onto a reel which is mounted on the deck of a pipelay barge. Horizontal reels lay pipe with an S-Lay configuration. Vertical reels most commonly do J-Lay, but can also S-Lay.

Umbilicals can be installed either by a reel-lay vessel or a carousel-lay vessel. Reels provide easy load-out. The maximum installed umbilical length is 1.9– 9.3 mile (3 to 15 km), depending on the diameter of the reels. The critical gross weight of reels with umbilicals is about 250 ton (226 metric ton). However, a carousel allows for a ... In the Reel-Lay method, the pipeline is installed from a huge reel mounted on an offshore vessel. Pipelines are assembled at an onshore spool-base facility and spooled onto a reel which is mounted on the deck of a pipelay barge. Horizontal reels lay pipe with an S-Lay configuration. Vertical reels most commonly do J-Lay, but can also S-Lay. Nov 07, 2019 · Subsea 7's newbuild reel lay vessel Seven Vega has been transported from Royal IHC's shipyard in Krimpen aan den IJssel to Rotterdam Heijplaat through the beautiful scenery of Rotterdam. Launched in May 2019, Seven Vega is a high-specification vessel capable of installing complex rigid flowlines including pipe-in-pipe systems.

Reel-lay is a highly specialised discipline in the SURF market, dominated by Tier 1 subsea contractors. Our reel-lay vessels are built to suit specialist requirements and specifications with full integration of the reel-lay equipment, either by Royal IHC or third party suppliers. Subsea 7 and Royal IHC launched the fully integrated reel-lay vessel Seven Vega on Saturday, May 25, 2019. Seven Vega; Source: Royal IHC. Following an announcement made by Subsea 7 last Friday that the Seven Vega vessel was ready for a launch and naming ceremony, Royal IHC said on Sunday that the ceremony took place at its shipyard in Krimpen aan den IJssel, The Netherlands, and was performed ... Lewek Constellation’s pipelay equipment includes a combined pipelay tower for reel lay and flex lay over a moonpool. It includes two rigid 400t each tensioners and two flexible tensioners of 260t each, a rigid 900t hang-off clamp, six removable 1,150t reels for rigid pipe and two fixed 1,250t each under-deck carousels for flexible pipe. UK-based subsea engineering, construction, and services company Subsea 7 is ready for a launch and official naming ceremony for its newbuild reel-lay vessel Seven Vega. Subsea 7 announced through its social media channels on Friday that the Seven Vega will be launched and officially named on Saturday, May 25. “When delivered, Seven Vega will be […] Sep 06, 2017 · Subsea 7 has signed a letter of intent with Royal IHC in the Netherlands for the construction of a new reel-lay vessel and associated pipe lay equipment. The cost, excluding capitalised interest, is expected to be below USD 300 million with an early 2020 delivery. The firm contract with Royal IHC is expected to be awarded […] Reel-lay is a highly specialised discipline in the SURF market, dominated by Tier 1 subsea contractors. Our reel-lay vessels are built to suit specialist requirements and specifications with full integration of the reel-lay equipment, either by Royal IHC or third party suppliers.

Nov 07, 2019 · Subsea 7's newbuild reel lay vessel Seven Vega has been transported from Royal IHC's shipyard in Krimpen aan den IJssel to Rotterdam Heijplaat through the beautiful scenery of Rotterdam. Launched in May 2019, Seven Vega is a high-specification vessel capable of installing complex rigid flowlines including pipe-in-pipe systems. The S-Lay method is used for pipelines with diameters from 10 to 30'' in water up to 5000 m. For this type of installation requires an S-Lay vessel, which is basically a floating welding factory, where pieces of 12 m long pipes joint to form the pipeline and lowered to the seabed (Fig. 1). Sep 07, 2017 · Subsea 7 S.A. yesterday announced that it has signed a letter of intent with Royal IHC in the Netherlands for the construction of a new reel-lay vessel and associated pipe lay equipment. The cost, excluding capitalised interest, is expected to be below USD 300 million with an early 2020 delivery. Umbilicals can be installed either by a reel-lay vessel or a carousel-lay vessel. Reels provide easy load-out. The maximum installed umbilical length is 1.9– 9.3 mile (3 to 15 km), depending on the diameter of the reels. The critical gross weight of reels with umbilicals is about 250 ton (226 metric ton). However, a carousel allows for a ...

Company is able to perform continuous reel-lay operation in remote locations, including the Artic, through the use of a dedicated spool barge which transports up to 4 reels of pipe to the vessel locations and a 3000T crane on the reel-lay vessel which helps to load and off-load pipe reels. Installation analysis is a type of calculation for the validation of lifting capacity, strength capacity for lifting objects and vessel structures, etc. Installation analysis can be divided into two categories based on different phases of installation engineering:

On Saturday 25 May 2019, Subsea 7 and Royal IHC successfully launched the fully integrated reel-lay vessel SEVEN VEGA.The ceremony took place at IHC’s shipyard in Krimpen aan den IJssel, The Netherlands, and was performed by Monica Th. Bjørkmann, Vice President for Subsea 7 in Norway.

The Next Generation of Reeled Pipe Lay Vessels: for Ultra Deep Water Field Developments in Remote Locations SUBSEA ASIA 2012 Kuala Lumpur Convention Centre, Malaysia Conference 03 October 2012 By John Meenaghan VP Global Operations Rigid Pipelines On Saturday 25 May 2019, Subsea 7 and Royal IHC successfully launched the fully integrated reel-lay vessel SEVEN VEGA.The ceremony took place at IHC’s shipyard in Krimpen aan den IJssel, The Netherlands, and was performed by Monica Th. Bjørkmann, Vice President for Subsea 7 in Norway.

Offshore Fleet : Pipelaying Vessel: Pipelaying vessel (PLV) or pipelay vessel is a specialized floating facility for submerged pipeline laying. It is widely used in offshore fields development for laying pipelines up to 1,420 millimeters in diameter down to 2,500 meters depth. Can lay or retrieve 10,000-lb tension (using caterpillar) Supports retrieval of short lengths; Can be incorporated with a conventional lay reel ; System includes two power packs for autonomous operations of carousel and caterpillar, detachable control panel, and backup power supply

Oct 02, 2017 · Royal IHC and Subsea 7 have signed a firm contract for the design and build of a new reel lay vessel, following a letter of intent announced in September this year. The vessel will be capable of installing rigid flowlines including pipe-in-pipe systems from shallow waters to depths of up to 3000m. With model tank testing […] Feb 06, 2018 · KINDERDIJK, The Netherlands -- Royal IHC has successfully passed the first significant milestones in the design and build process of an integrated reel lay vessel for Subsea 7. UK-based subsea engineering, construction, and services company Subsea 7 is ready for a launch and official naming ceremony for its newbuild reel-lay vessel Seven Vega. Subsea 7 announced through its social media channels on Friday that the Seven Vega will be launched and officially named on Saturday, May 25. “When delivered, Seven Vega will be […] The keel laying ceremony for Subsea 7’s new reel-lay vessel took place at Royal IHC in Krimpen aan den IJssel (Netherlands) on July 5, 2018. In line with this major milestone Subsea 7 announced the vessel will be named Seven Vega. Lewek Constellation’s pipelay equipment includes a combined pipelay tower for reel lay and flex lay over a moonpool. It includes two rigid 400t each tensioners and two flexible tensioners of 260t each, a rigid 900t hang-off clamp, six removable 1,150t reels for rigid pipe and two fixed 1,250t each under-deck carousels for flexible pipe.